Portfolio of Zarbuloq Injiniring
Installation and repair works of equipment inside pump station building
View of "Besharyk" pump hall before and after rehabilitation works.
View of "Narpay" pump hall before and after rehabilitation works.
View of "Narpay" pump station control and power distribution panels.
Repair and installation works on the suction and discharge pipeline
Gateways and trash screens installation at the "Besharyk" pump station intake.
Pipeline dismantling with subsequent installation of more than 3 km of 820 mm, 1020 mm, 1220 mm and 1420 mm diameter pipelines at the "Narpay" and "Besharyk" pump stations.
The reconstruction of the discharge pipeline at "Narpay" and "Besharyk" pump stations: replacement of worn out sections of pipe, installation of irregular bends, X and Y-connections.
The reconstruction of the discharge pipeline at "Narpay" and "Besharyk" pump stations: replacement of worn out sections of pipe, installation of irregular bends, X and Y-connections.
Introduction of innovative shotcreting technology for the reconditioning of steel pipelines and waterproofing of buildings and structures foundations
Rehabilitation of Amu Bukhara 1 pump station discharge pipeline Ø3640 mm.
Rehabilitation of KMK M-II-1 pump station discharge pipeline Ø1220 mm.
Arch fastening by shotcreting for tunnel construction
Works are carried out with using a hydraulic robotic manipulator controlled remotely.